Site Logo
My Account | Wishlist | Basket
All Categories
Charging Components

Charging Cables

See More
Rex
Charging Components - Charging Cables

  1. Home
  2. Charging Components
  3. Charging Cables
Product Image

USB C to Type C Cable 3A 60W Fast Charger Cable Long Lead 0.5M 1M 2M 3M 4M 5M

£5.99

Lengths: 0.5m / 1m / 1.5m / 2m / 3m / 5m. Rex Gadgets® 60W Ultra Fast USB-C Charging Cable. Power Output Up to 60W (PD). copper cores for stable power output. Core Material Tin-Plated Oxygen-Free Copper.

This product would be ideal for users who require a long-length USB-C to USB-C cable and a powerful 60W fast charger for their devices.

Product Reviews

Name: Review:

Related Products

Elebase iPhone 17 Pro Max Charging Cord 1/2/3 M 3Pack,USB C to Type C,60W Fast

Elebase iPhone 17 Pro Max Charging Cord 1/2/3 M 3Pack,USB C to Type C,60W Fast

£16.45

XAVURO 2-in-1 240w USB C to Type C Invisible Stand Charging Cable,2pcs 1.5m Flat Fast Charger Cord with Foldable Phone Holder for Gaming, Office & Travel, Black

XAVURO 2-in-1 240w USB C to Type C Invisible Stand Charging Cable,2pcs 1.5m Flat Fast Charger Cord with Foldable Phone Holder for Gaming, Office & Travel, Black

£9.99

USB C to USB C Cable 3m, 60W C to C Charger Cable Fast Charge Long Type C to Type c cable Wire Data Lead for iPhone 17 Air 16 15 Pro, Macbook, iPad Pro, Samsung S25 S24 S23 S22 S21, Pixel, Huawei,Oppo

USB C to USB C Cable 3m, 60W C to C Charger Cable Fast Charge Long Type C to Type c cable Wire Data Lead for iPhone 17 Air 16 15 Pro, Macbook, iPad Pro, Samsung S25 S24 S23 S22 S21, Pixel, Huawei,Oppo

£4.58

2x USB-C to USB-C Fast Charging Cable Rapid Charger Type C to Type C set of 2

2x USB-C to USB-C Fast Charging Cable Rapid Charger Type C to Type C set of 2

£9.19

Kobilar USB C to USB C Cable, 100W 5A Super Fast Charging, PD 3.0, Type C to Type C, 5-Pack-1.5M, for iPhone 17/16 Pro Max, iPad Pro,Samsung Galaxy S25/24 (5pack-1.5M)

Kobilar USB C to USB C Cable, 100W 5A Super Fast Charging, PD 3.0, Type C to Type C, 5-Pack-1.5M, for iPhone 17/16 Pro Max, iPad Pro,Samsung Galaxy S25/24 (5pack-1.5M)

£13.99

USB C to USB C Cable 3M, 100W USBC to USBC Cord, Type C to C Charger Cable Fast Charging for iPhone 16 15 Pro Max Plus, for Samsung Galaxy S24 S23 S22, for MacBook/iPad, Pixel -Yellow

USB C to USB C Cable 3M, 100W USBC to USBC Cord, Type C to C Charger Cable Fast Charging for iPhone 16 15 Pro Max Plus, for Samsung Galaxy S24 S23 S22, for MacBook/iPad, Pixel -Yellow

£5.60

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyEV.uk 2026